BEM Circulars & Guideline
CIRCULAR NO. | TITLE |
Circular No. 001 | Code of Conduct of Registered Person |
Circular No. 002 *NEW* | Continuing Professional Development(CPD) |
Circular No. 003 | Submission of Sewerage and Sanitary Plumbing Works |
Circular No. 004 | Supervision of Construction Works |
Circular No. 005 | Advertising by Registered Engineers |
Circular No. 006 | Engineer's Responsibility for Subsurface Investigation |
Circular No. 007 | PEPC Endorsement on Certificate of Completion and Compliance (CCC) and Form Gs |
Circular No. 008 | Procedure for a Registered Engineer or an Engineering Consultancy Practice Taking Over the Work of Another Registered Engineer or an Engineering Consultancy Practice |
Circular No. 009 | Submission of Building Plans by Professional Engineers with Practising Certificate and Architects |
Circular No. 010 | Circular for Checking/Reviewing The Work of Another Engineer Checking/Reviewing The Work of Another Engineer - Table A |
Circular No. 011 | Scope of Works, Roles, and Responsibilities for Accredited Checker |
Circular No. 012 | Exemption of Business Premise License for Engineering Consultancy Practice |
New Requirements For The Endorsement Of Form G’s Under By-Law 25 And 27 Of The Uniform Building By-Laws By Designated Persons For Issuance Of Certificate Of Completion And Compliance (Ccc) | |
Circular No. 5/2005 | General Advice On Giving Of Second Opinion |
Circular No. 1/2009 | Payment of Stamp Duty |
BEM/PPC/05-49 | Submission of Erosion and Sedimentation Control Plan (ESCP) For Earthworks Plan Submission |
BEM/PPC/05-51 bil (04) | Registration of Data Users Gazetted Under P.U.A. 336 Personal Data Protection Act 2010 (Act 709) |
BEM/SOF/01-1 Jld.1 | Professional Fee Bidding |
BEM/SOF/01-1 Jld.1 (a) | Scale of Fees By Engineering Consultancy Practice |
GUIDELINE NO. | TITLE |
The Role and Responsibility of Professional Engineers for Temporary Works During Construction Stage | |
Industrialised Building System (IBS) Works and Its Impact on Scale of Fees | |
The Role and Responsibility of Professional Engineers in Earthworks and Buildings Designed by Different Submitting Persons | |
General Guidelines for Professional Civil Engineers Undertaking Engineering Survey Works | |
Guiding Principles on Teaching-Learning and Assessment Implementation During COVID-19 Pandemic | |
General Guidelines on Integrity Management System for Engineering Consultancy Practice | |
Guidelines on Ethical Usage of Digitalization Technology for ECPs and Registered Persons | |
Guideline No. 008 *NEW* | Guidelines On The Roles Of Construction Work Designer (CWD) And Principal Construction Work Designer (PCWD) Under The CDM Regulations 2024 |
A Guide to Good Engineering Practice for M&E Engineers |
OTHERS
NO. | DOCUMENTS | ATTACHMENT |
1. | Keperluan Laporan Geoteknik dalam Permit Pembangunan di Kuala Lumpur *NEW* | Download |
2. | Liputan Akta Pembangunan Sumber Manusia Berhad Dan Pengecualian Levy Bagi Sektor Baru Yang Diliputi | Download |
3. | Pekeliling Suruhanjaya Tenaga Bil. 03/2012 Penggunaan Kabel Kuasa Bersaiz 1.5mm persegi Jenis Kuprum Bagi Tujuan Pendawaian Litar Lampu | Download |
4. | Pekeliling Suruhanjaya Tenaga BIL.2/2011-Kelulusan Untuk Mengilang Dan Mengimport Flourescent Ballast | Download |
5. | Template Seragam Senarai Semak Dokumen Dan Senarai Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat Setempat (OSC) | Download |
6. | Pekeliling Ketua Setiausaha Kementerian Perumahan dan Kerajaan Tempatan
| Download Download |
7. | Pematuhan undang-undang kecil di bawah undang-undang kecil bangunan seragam 1984 (UKBS 1984) berkaitan kemudahan akses orang kurang upaya (OKU) | Download |
8. | Arahan penguatkuasaan pemakaian Standard Malaysia MS IEC 62305 'Protection Against Lightning' bagi sistem perlindungan kilat di bangunan | Download |
9. | Pelaksanaan mekanisma pengeluaran surat pengesahan pematuhan bagi pemasangan utiliti air/pembetungan dalam masa 28 hari untuk permohonan perakuan siap dan pematuhan (CCC) | Download |
10. | Pemberitahuan pendaftaran Jurutera Geoteknikal dan Jurutera Pemeriksa bebas di jabatan kejuruteraan, Majlis Bandaraya Pulau Pinang | Download |
11. | Arahan pemakaian pelaksanaan wang jaminan penyelenggaraan (WJP) ke atas Koridor Utiliti Pahang (KUP), syarikat-syarikat utiliti serta pemaju bangunan dalam urusan permit kerja-kerja utiliti dan pemajuan pembangunan baru di Majlis Bandaraya Kuantan |